For boaters who frequent Remley’s Point, getting out on the water is about to get a little easier. Charleston County Parks is preparing for a major improvement project at Remley’s Point Boat Landing that will expand launching capacity, improve parking and make the waterfront more accessible to visitors of all abilities.
Located at 80 5th Ave in Mount Pleasant, Remley’s Point is an important public access point for boaters in the Charleston area. The upcoming improvements are designed to make the facility safer and more efficient while better accommodating the needs of the boating community.
Construction is expected to begin in mid-November 2026, with the project anticipated to wrap up in early Summer 2027. The boat landing will remain closed throughout the construction period.
One of the most significant additions will be a new four-ramp concrete boat launch. The expanded launch area will help improve the process of putting boats in and taking them out of the water, allowing for more efficient launching and retrieval.
The project will also bring several upgrades to the dock system. New floating docks, including concrete breakwater and aluminum docks, will be installed along with ground-out docks and new gangways connecting the upland areas to the floating facilities. A new 210-foot fixed wave break will provide additional protection from wave action, helping create a safer and more stable environment for boaters.
Parking is getting attention, too. Plans call for 11 additional trailer parking spaces and eight additional car parking spaces, along with resurfaced and restriped parking areas. Additional gravel overflow parking will provide more room during busy periods, while dedicated tie-down and make-ready areas will give boaters more space to prepare their vessels before heading out.
Accessibility is another important part of the project. Dedicated ADA parking spaces for cars and trucks with trailers will be added, with accessible routes connecting those spaces to the docks and launch areas. New accessible gangways will also improve connections between the upland areas and floating docks.
When complete, the improvements will provide more than just a refreshed boat landing. The expanded facilities are expected to increase launching capacity, improve traffic flow and parking operations, strengthen shoreline resilience and make waterfront recreation more accessible to the public.
For Charleston-area boaters, the project represents an investment in one of the community's public waterfront access points. While visitors will need to make other arrangements during the construction period, the end result will be a more capable, accessible and efficient place to get out on the water.
To learn more about the Remley’s Point Boat Landing Improvements Project, visit the Charleston County Parks website.