Remley’s Point Boat Landing Improvements

The Remley’s Point Boat Landing Improvements Project will enhance public access, boating operations, safety, and accessibility at the existing boat landing. Construction is expected to begin in mid-November 2026 and be completed in June 2027. The boat landing will remain closed throughout construction.

 
Key Additions & Facility Improvements
The project will deliver numerous upgrades, including:
  • Construction of new 4-ramp concrete boat launch to improve launching and retrieval efficiency
  • Installation of new floating docking systems, including:
    • concrete breakwater floating docks
    • aluminum floating docks
    • ground-out docks
    • new gangways connecting upland areas to dock facilities
  • Construction of a new 210-foot fixed wave break/breakwater to improve protection from wave action and enhance boating safety
  • Expanded and improved parking facilities, including:
    • addition of 11 trailer parking spots
    • addition of 8 car parking spots
    • resurfaced and restriped parking areas
    • additional gravel overflow for car parking
    • dedicated tie-down and make-ready areas
 
ADA Accessibility Improvements

This project includes improving accessibility and ensuring full compliance with ADA standards. Enhancements will include:

  • Creation of dedicated ADA car and truck/trailer parking spaces with accessible routes to docks and launch areas
  • New accessible gangways connecting upland areas to to floating docks
 
Community Benefits

Upon completion, the project will provide a safer, more efficient, and more accessible boating and recreation facility for the public. The improvements will increase capacity for boat launching activities, enhance shoreline resilience, improve traffic flow and parking operations, and ensure that visitors of all abilities have equitable access to the waterfront amenities and boating facilities.